1
MODERNIZATION & EXPANSION OF LAKE VICTORIA PORTS LOT 1 FOR BUKOBA PORT.

CLIENT: TANZANIA PORTS AUTHORITY (TPA)

CONTRACTORS: CRMBEG

SUBCONTRACTOR: JAVALI COMPANY LIMITED

Supervision and implementation of Environmental and socio management plan (ESMP) during construction and commissioning phases. Supervision of HIV/AIDS expert subcontractor 2024
2
ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT FOR THE PROPOSED ESTABLISHMENT OF UYOLE SERVICE STATION TO BE LOCATED ON PLOTS NO. 1/2/3, BLOCK “B” UYOLE AREA, HASANGA MTAA, UYOLE WARD IN MBEYA MUNICIPALITY, MBEYA REGION
CLIENT: GAPCO/TOTALENERGIES
o  Data collection for EA preparations

o  Preparation of Project brief, project registration and registration with NEMC

o  Public consultation and preparation of resettlement action plan

o  Preparation of EIS and attending TAC meetings

o  Hazards Identification ,monitoring ,evaluation  and Risk Assessment

o  Supervision of ESMP during construction phase

2024
3 INITIAL ENVIRONMENTAL AUDIT (IEA) OF THE EXISTING TOTAL ENERGIES MSAMVU SERVICE STATION LOCATED ON PLOT NO. 125 BLOCK ‘B’ SUME MTAA, MWEMBESONGO WARD, MOROGORO MUNICIPALITY, MOROGORO REGION

CLIENT: TOTAL ENERGIES MARKETING

o  Data collection for EA preparations

o  Preparation of Project brief, project registration and registration with NEMC

o  Public consultation and preparation of scoping report

o  Hazards Identification ,monitoring ,evaluation  and Risk Assessment

o  Design and construction supervision of bundwall for generator house

o  Preparation of EA report and attending TAC meetings

2024
4 ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT FOR THE PROPOSED ESTABLISHMENT OF FUEL FILLING STATION AT PLOTS NO. P5353, P5355 MBAGALA KUU MASHARIKI MTAA, MBAGALA KUU WARD, TEMEKE MUNICIPALITY,

DAR ES SALAAM

CLIENT:

ROGAS E.A LIMITED

P.O.BOX 75564

DAR ES SALAAM, TANZANIA

o  Data collection for EIA preparations

o  Preparation of Project brief, project registration and registration with NEMC

o  Public consultation and preparation of resettlement action plan

o  Preparation of EIS and attending TAC meetings

o  Hazards Identification ,monitoring ,evaluation  and Risk Assessment

o  Creating environmental awareness to clients from different industries which have loans with Exim Bank and all staffs i.e Conduction of environmental seminars and education –power point presentation based on OSHA/SHE.

o

2023

 

5 PROVISION OF TECHNICAL SERVICES ON BOILER SMOKE AND SOLID PARTICLE REMOVALFROM BOILER EFFLUENT GASEOUS; DESIGN, FABRICATION AND INSTALLATION

 

NATURE: DESIGN AND BUILD

 

CLIENT: TANZANIA TOOKU GARMENTS CO LTD

-Preliminary investigation of ambient air quality at the factory

-Air quality measurements and monitoring

o  -Design, fabrication, installation, testing and commissioning of air scrubber system

November 2023
6  

INITIAL ENVIRONMENTAL AUDIT (IEA) FOR THE EXISTING PIPELINES FROM DAR ES SALAAM PORT (KOJ2) TO TOTAL DEPOT LOCATED AT MIVINJENI MTAA, KURASINI WARD, TEMEKE MUNICIPALITY IN DAR ES SALAAM REGION

CLIENT: GAPCO/TOTALENERGIES
o  Review of documentation available from the Client and others.

o  Provide description of the relevant parts of the project, including project justification, location, general layout, size, and capacity, area of influence of the road works, etc.

o  Assemble, evaluate, and present baseline data on the relevant environmental characteristics of the study area, including the physical and biological environment.

o  Data collection for preparation of IEA documents

o  Carrying out an Environmental and Social Impact Assessment of the project and prepare Environmental and Social Management Plan in order to minimize any negative impacts that the proposed project will have on the environment

o  Attend TAC meetings, correction, improvement and final submission of EA report

OCTOBER 2022
7 INITIAL ENVIRONMENTAL AUDIT (IEA) REPORT FOR THE TOTAL ENERGY SERVICE STATION LOCATED ON PLOT NO. 22, BLOCK “E” AT MAKUYUNI VILLAGE, MAKUYUNI WARD, MONDULI DISTRICT, ARUSHA REGION

CLIENT: TOTAL ENERGIES MARKETING

 

o  Data collection for EA preparations

o  Preparation of Project brief, project registration and registration with NEMC

o  Public consultation and preparation of scoping report

o  Hazards Identification ,monitoring ,evaluation  and Risk Assessment

o  Design and construction supervision of bundwall for generator house

o  Preparation of EA report and attending TAC meetings

 

2022
8 REHABILITATION AND UPGRADING OF NDUMBI PORT, CONSTRUCTION OF NDUMBI JETTY AT LAKE NYASA  IN RUVUMA REGION

Location: TANZANIA

CLIENT: Tanzania Ports Authority (TPA)

MAIN CONTRACTOR: CHICO

SUBCONTRACTOR: JAVALI COMPANY LIMITED

Supervision and implementation of Environmental and socio management plan (ESMP) during construction and commissioning phases. Implementation of HSE monitoring and management plans 2022

 

 

9 ENVIRONMENTAL AUDIT (EA) FOR THE EXISTING SONGWE TOTAL ENERGIES SERVICE STATION LOCATED ON PLOT NO. 414, BLOCK D, IKUMBI VILLAGE, BONDE LA SONGWE WARD, MBEYA DISTRICT IN MBEYA REGION

CLIENT: TOTAL ENERGIES MARKETING

 

o  Review of documentation available from the Client and others.

o  Provide description of the relevant parts of the project, including project justification, location, general layout, size, and capacity, area of influence of the road works, etc.

o  Assemble, evaluate, and present baseline data on the relevant environmental characteristics of the study area, including the physical and biological environment.

o  Data collection for preparation of IEA documents

o  Carrying out an Environmental and Social Impact Assessment of the project and prepare Environmental and Social Management Plan in order to minimize any negative impacts that the proposed project will have on the environment

o  Attend TAC meetings, correction, improvement and final submission of EA report

 

2022
10 PRELIMINARY CONCEPTUAL DESIGN AND ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT FOR THE PROPOSED SANITARY LANDFILL AT KISARAWE II, KIGAMBONI, DAR ES SALAAM.

CLIENT: DAR ES SALAAM CITY COINCIL

 

o  Design and provide technical drawings for design of the conceptual waste treatment facility (weigh brigde, firefighting, garage, repair shop, soil stockpile, offices, parking, area dedicated for collection vehicles, area dedicated for cover materials)

o  Design of single landfill cell for the residual solid waste after treatment and recycling

o  Preparation of Bills of Quantities,

o  Producing technical report

o  Preparation of project Brief and scoping report for ESIA

o  Preparation of Terms of Reference for conducting ESIA

Preparation of ESIA report and presentation to Kigamboni Municipal Council and NEMC

2021
11
UPGRADING AND REHABILITATION OF SONGEA AIRPORT.

CLIENT: TANROADS

CONTRACTORS: CHICO

SUBCONTRACTOR: JAVALI COMPANY LIMITED

Supervision and implementation of Environmental and socio management plan (ESMP) during construction and commissioning phases. PROVISION OF HSE Services, and supervision of HIV/AIDS preventive measures implementation status 2020
12 ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT FOR THE PROPOSED DEVELOPMENT OF MONGOLANDEGE BRIDGE AND UPGRADING OF APPROACHING ROADS TO 150 METERS FROM MSIMBAZI RIVER BANKS IN ILALA MUNICIPAL, DAR ES SALAAM,

CLIENT: TARURA

 

o  Identify, analyze and assess environmental impacts of the proposed bridge and road works, assigning economic values when feasible.

o  Suggest cost-effective measures for minimizing or eliminating adverse impacts of the proposed road works with the costs of implementing these measures estimated and presented where possible.

o  Prepare Environmental Management Plan, including proposed work programme, budget estimates, schedules, staffing and training requirements as necessary to implement the mitigation measures.

o  Identify institutional needs to implement environmental assessment recommendations.

o  Prepare detailed arrangements to monitor the implementation of mitigating measures and the impacts of the project during construction and operation.

o  Prepare the Environmental & Social Impact Assessment report.

o  Carrying out an Environmental and Social Impact Assessment of the project and prepare Environmental and Social Management Plan in order to minimize any negative impacts that the proposed project will have on the environment

 

2020
13 ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT FOR THE PROPOSED DEVELOPMENT OF NYEBURU BRIDGE AND UPGRADING OF APPROACHING ROADS TO 150 METERS IN ILALA MUNICIPAL, DAR ES SALAAM,

CLIENT: TARURA

 

o  Identify, analyze and assess environmental impacts of the proposed Bridge and road works, assigning economic values when feasible.

o  Suggest cost-effective measures for minimizing or eliminating adverse impacts of the proposed road works with the costs of implementing these measures estimated and presented where possible.

o  Prepare Environmental Management Plan, including proposed work programme, budget estimates, schedules, staffing and training requirements as necessary to implement the mitigation measures.

o  Identify institutional needs to implement environmental assessment recommendations.

o  Prepare detailed arrangements to monitor the implementation of mitigating measures and the impacts of the project during construction and operation.

o  Prepare the Environmental & Social Impact Assessment report.

o  Carrying out an Environmental and Social Impact Assessment of the project and prepare Environmental and Social Management Plan in order to minimize any negative impacts that the proposed project will have on the environment

 

2020
14
SLOPE PROTECTION FOR IRINGA SUBSTATION: SOFT LANDSCAPING USING GRASS

CLIENT: TANESCO

CONTRACTORS: HYOSUNG CORPORATION and CSI ELETRICAL

SUBCONTRACTORS: ENVE COMPANY/JAVALI COMPANY LIMITED

 

Design and construction of soft landscape

Design and Construction of drainage systems

Supervision of ESMP for the project

2018